Move to the text

Export trade

autosojingu of procurement duties

With progress of the globalization, a company establishing the production base abroad becomes more and more.
It is procurement, the supply of material, consumption parts and the device to be indispensable to the smooth operation of these overseas production lines.
I allot the reasonable staff to take the supply duties almost this lifeline in the parent company of the Japanese side and will spend time and human cost. We have the overseas trading function as the trading company having the longtime experience for the line of a variety of types of industry and abundant technical knowledge.
I turn into the procurement section of the customer and provide the outsourcing of procurement duties to perform confirmation, the meetings such as the overseas specifications with the base directly.

 

Import business

I import a special order processing product (one piece of article, half-finished goods, product) and general-purpose products from China, Taiwan, Germany (EU countries).
I suggest the product which fitted the needs of the customer and provide it.

The import of Japan reaches about 73 trillion yen according to trade statistics of Ministry of Finance and traces about 1.78 times ten years ago, about 3.47 times 20 years ago and the course of the increase, and the foreign countries product becomes more and more indispensable to modern industry structure.
The use of import goods is the useful procurement method that the choices such as cost, specifications are spread. Experience is necessary with the staff that various work such as import procedures is necessary in addition to a product, the maker choice, specifications confirmation like a domestic article and import it directly in-house.
We make full use of experience and the overseas network which I cultivated in trade experience of 40 remainders year and suggest the product which matched needs.

The handling area

Main import country
China
Taiwan
German/EU countries
The United States
I suggest a multi-kind, the import that I make full use of every method, system in small quantities and accepted the situation of the customer with reasonable cost. When I am thought in small quantities, and it is thought whether the import is difficult, at first please consult.

Special order artefact

I produce the special order product based on a drawing.

Materials

It supports steel, stainless steel, aluminum, a casting, a lot of resin materials and comes.

The number of the production lot

Please consult regardless of big things and small things of the lot.

Deadline

A normal deadline: About 2-3 month
As it varies according to a kind and the amount of the product, transport methods, please consult.

Basic flows (it varies according to the situation.) from specifications meeting to mass production start

Processing example

Cut
Lathe processing, mashiningu processing, fraise processing, articulation, keyway processing
Polish
Whetstone abrasion, electrolytic machining
Sheet metal processing
Laser material processing, press working
Welding
Electric welding, autogenous welding, spot welding
Surface-treat
Various plating, electrolytic machinings, acid wash processing, the electrodeposition painting, the enameling painting
Heat-treatment
Conditioning, high frequency quenching, cementation quenching, soft; nitride
Forging
Cold forging, forging between the heat, rolling forging
Molding processing
Casting, lost wax (precision casting), resin injection molding, die-casting molding

Unit product

Please leave the unit product which put an overseas artefact, a general-purpose product together other than the use in the parts one piece of article to us.

I help with the total reduction of your assembling costs by having half-finished goods, all products entrust you as a unit.

Merit of the unit ordering

Act
Introduction merit
Ordering work
There is a great deal of issuance of the order form (next for = parts score).
For the ordering with every unit (Assy,Sub Assy), I can reduce the issuance order form score.
Deadline management
You must confirm it for each order form each to each maker, trading company, and duties are easy to become complicated.
Because the number of the order form decreases, deadline confirmation becomes easy.
Product acceptance
Because there are many parts scores, large warehouse space is necessary.
Because there are few parts scores, it is easy to do warehouse rearranging.
Inventory control
A lot of kinds of the inventory control take effort for adjustment depending on the production situation.
Because parts score decreases, I am easy to manage it.
Quality control
Inspection is necessary for each parts and takes effort.
I can simplify an inspection item in the company.

General-purpose product

Other than a valve, a coupling, it supplies the equivalency products of the product in Japan.
As I cope with the reimportation of the Japanese product, please consult when procurement in the country is difficult.

The procurement company with the results utilizes our network to the maximum from the start and suggests the product which is equal to the needs of the customer widely from China and a market of Taiwan. As I may cope, please consult about the acquisition such as samples.
 

Amount

As there is the product which can support from several, please consult regardless of big things and small things of the lot.

Deadline

A normal deadline: About one month ...
When it supports a limited express by the AIR convenience business, there is it from around one week when it is possible.
As it varies according to a kind or the amount of the product, please consult.
Back to TOP